Fairbanks MillAbout Fairbanks Mill, Let Us Share Our Experience With You

 

Trash Rake Installation
INCREASED RELIABILITY

Owner: Bethel Mills Hydro
Location: Bethel, VT

Bethel Mills Hydro Station

BETHEL MILLS HYDRO STATION

In order to increase plant reliability and reduce labor costs, a new HTS trash rake was installed. An existing concrete diversion boom was modified to accommodate the increased structural loading of the rake. Rake operation can be programmed to a timed cycle, trashrack water level differential, or operated manually.

 

 

 

Home | About Fairbanks Mill | Services | Projects | Contact Us
87 Factory St., PO Box 86 | St Johnsbury VT 05819 | Tel: 802.748.8094
Site by FLEK Inc.